Projects
BAE Systems
For a PRP in a complex and highly contentious TCE remediation, Synergy works on behalf of a PRP in investigating and performing agency negotiations for appropriate and necessary corrective action.
Top Star Inc.
For a gasoline service station client, Synergy performed site investigation and soil groundwater remediation to quickly achieve regulatory closure for a site which previously had been stalled in regulatory limbo.
Retail Gasoline Station 1
For a gasoline service station client, Synergy performed site investigation and soil and groundwater remediation including UST removal. Synergy was able to obtain a Release of Liability for the client by providing public water to a few affected residents and petitioning for ROL based on pathway elimination.
Environmental Site Assessments (Phase I and Phase II)
For the Lehigh Valley Economic Development Authority, Synergy performed site investigation, including soil and groundwater sampling, and prepared a detailed Site Assessment Report for the former Allentown Incinerator site. The report is currently under review to determine next steps in remedial approach.
Remediation System
For the Lehigh Valley Economic Development Authority, Synergy performed site investigation, conducted agency negotiations and prepared a detailed Site Assessment Report (SAR) for an abandoned former textile and die facility. The SAR has enabled the client to petition for closure based on attainment of STatewide Health Standards.
Petroleum Hydrocarbon Remediation
For this gasoline service station client, Synergy is performing operation, maintenance and monitoring using a remotely monitored custom designed ozone injection system.
Monitoring Well Installation
For the Redevelopment Authority of the city of Lancaster, Synergy performed site investigation and remediation for a multi-parcel site to prepare for construction of the Clipper Magazine Stadium (minor league baseball). Synergy investigated, developed and implemented a remedial workplan which enabled a release of liability for both soil and groundwater and enabled construction of the stadium.
Page 3 of 4 pages < 1 2 3 4 >



